glass
pen
clip
papers
heaphones

Part 1You Have Been Assigned As A Project Manager For A Small Construction Company And

Part 1You Have Been Assigned As A Project Manager For A Small Construction Company And

Part 1You Have Been Assigned As A Project Manager For A Small Construction Company And

Part 1You have been assigned as a project manager for a small construction company and have been assigned your first project
The client feels they have a basic grasp on their requirements but also feels that they will know more as the project progresses
  Using your knowledge of life cycle models, identify two models that may work based on your knowledge of the project
  The scope of the project is as follows: Requirement 1:  3 bedrooms Requirement 2:  2
5 bathrooms Requirement 3:  Pool  Requirement 4:  2 patios, one patio should be enclosed Using your experience documenting scope, outline the problem/opportunity statement you are trying to solve for, 2-3 success criteria, and any assumptions, risks, or obstacles
 Part 2Create a Work Breakdown Structure (WBS) for the following scope: Requirement 1:  3 bedrooms Requirement 2:  2
5 bathrooms Requirement 3:  Pool  Requirement 4:  2 patios, one patio should be enclosed Your WBS should be based upon your chosen Life Cycle Methodology and include any deliverables
 Assignment Requirements: The assignment is to answer the question provided above in form
Where applicable students can include diagrams if it will help provide a pictorial view of the solution
    This is to be in narrative form and should be as thorough as possible
Bullet points should not be used
  The paper should be at least 1
5 – 2 pages in length
Times New Roman 12-pt font, double-spaced, 1-inch margins Utilizing at least one outside scholarly or professional source related to project management
The textbook should also be utilized
Do not insert excess line spacing
APA formatting and citation should be used